How a European importer turned a two-page brief into a branded steel locker line — samples, tooling, production and export paperwork included.
In this month’s OEM spotlight we look at a recent project: a European importer that arrived with a two-page brief for a branded locker range and took delivery of its first container 60 days later.
Week one locked the design and colours; week three delivered pre-production samples for approval; by week six mass production was running on the dedicated line. The container shipped with private-label packaging and full export documentation.
The project used standard tooling with custom prints — the fastest way to launch a branded steel product without paying for new dies. For designs that need unique forming, our engineering team prepares a tooling plan together with your quotation.
Want samples, drawings or a quote on this story? Our team replies within one working day.
